top of page

Premium Perkins Power Solutions | Uncompromising Reliability

Our Custom Solution Process

1. Consultation

We begin with a detailed consultation to understand your specific power requirements and operational challenges.

2. Engineering Design

Our engineering team develops a custom solution designed specifically to address your unique power generation needs.

3. Production & Testing

We build and rigorously test your generator to ensure it meets or exceeds all performance specifications.

4. Delivery & Support

We deliver your custom power solution with comprehensive documentation and ongoing technical support.

FAQ'S

  • HUVOLT can create custom power solutions from 7kW to 2000kW and beyond, depending on your specific requirements.

    Generator  Sizes:

  • Typical lead times range from 8-16 weeks depending on complexity, but we can accommodate urgent requirements when necessary.

    Delivery Timeframe:

  • Our process begins with a detailed consultation to understand your requirements. We then develop engineering specifications, provide a comprehensive quote, and upon approval, proceed with manufacturing, testing, and delivery of your custom power solution.

    The Process:

  • Aftersales:

    HUVOLT provides flexible maintenance packages including preventative maintenance plans, emergency service, genuine parts supply, and extended warranties to ensure optimal performance and longevity of your custom generator.

bottom of page